New Slide Floor Replaced

At 6:45 this morning we pulled into bay #1 to have one of the main slide floosr replaced at Tiffin's expense.
 The job should take about 4.5 hours to complete.
By 7:00 AM all the bays are filled for factory repairs or custom work.
This was the scary part for me, watching them pull the slide out. We emptied the cabinets the night before. I hope they don't drop it!
This is what the coach looks like with the slide removed. The coach gets moved to the next bay so there's room to lay the slide down in order to replace the slide floor. 
The floor has been replaced and the slide hoisted upright for installation.
The slide is reinstalled, rewired, and fine tuned for proper alignment.
The total job took four men just under four hours to complete. I then took the coach for a ride to insure that there were no rattles. The guys did an excellent job, everything was clean and better than new and with no rattles.