Its been almost two weeks since the shingles have been delivered but the rain is causing a delay from doing the roof. The driveway is also ready to be poured if the rain ever stops.
At least the interior work goes on.
The plumber has finished the roughin
And the electrician is staring to pull wire.
They also did the form for our small front patio. There will be a small wall around the area.
No comments:
Post a Comment