At 6:45 this morning we pulled into bay #1 to have one of the main slide floosr replaced at Tiffin's expense.
The job should take about 4.5 hours to complete.
By 7:00 AM all the bays are filled for factory repairs or custom work. |
This is what the coach looks like with the slide removed. The coach gets moved to the next bay so there's room to lay the slide down in order to replace the slide floor.
|
The slide is reinstalled, rewired, and fine tuned for proper alignment. |
1 comment:
Wow! Glad it went well, that is definitely a job to have done at the factory!
Post a Comment